Services
From first specification to install handoff.
One accountable partner for any FF&E scope, from full package to single items. You contract with one team in Hong Kong; we are responsible for specification, price, quality and delivery, and place production with independent factories chosen for each package.
Engagements
Choose the scope that fits the plan.
-
Full package
The complete FF&E path for a hotel or serviced-apartment repositioning: brief from the business plan, specify and cost, source and sample, inspect production, hand off shipping and install documentation.
-
Per-room package
A guestroom set specified and costed per key (casegoods and seating as the core; lighting, bathroom fittings, and soft goods as required).
-
Spot sourcing
A single category or short list when the rest of the FF&E is already committed.
From brief to package
We start at design stage, with your plan, not at the purchase order.
We join early, while drawings can still change. Together we set budget, quality level and timeline, so FF&E is planned like the rest of the project, not bought last.
Purpose-driven
We agree where to spend more and where standard is enough, so money is not tied up where it won’t pay back.
Cost per key and per m²
We budget per key and per square metre first, then source to that number and your programme.
Product lifecycle
We weigh durability, upkeep and replacement, so a short hold isn’t over-specified.
Three product tiers
Essential, Standard and Upgrade prices side by side, so you see what each extra dollar buys.
How we work
Four steps your asset team can plan against.
-
Spec and value engineering
Essential / Standard / Upgrade tiers against the hold period. No published standard price list.
-
Sourcing and sampling
Made-to-order from Greater Bay Area factories; sample lock before production.
-
Production QC
Vetting, in-production checks, pre-shipment inspection (third-party where required).
-
Logistics and install handoff
Packing, shipping, compliance documents as applicable, install handoff file. Not a turnkey install guarantee.
Five points where you approve
- Specification sign-off
- Sample approval
- Production release
- Pre-shipment check
- Handoff acceptance
What we source
Guestroom casegoods and seating first.
- Casegoods and seating: guest-room and public-area furniture
- Lighting: guest-room, corridor and F&B lighting
- Bathroom and soft goods: fixtures, fabrics and loose items
Deliverables
What your team receives.
- Specification pack and budget
- Sample board
- QC and inspection reports
- Packing and shipping documents
- Install handoff file
Logistics and install handoff
Delivered to the opening date, room by room.
We plan backwards from your opening date, then close out with a documented handover to the installer. This is not a turnkey installation guarantee.
Pack
Room-by-room, floor-by-floor labelling and packing lists.
Ship
Consolidated sea or air freight from Hong Kong and South China.
Clear
Invoice, packing list, origin and test certificates.
Deliver
Staged to site against the install and opening programme.
Handover
Installer briefing, snag list, spares and attic stock.
The handoff pack
- Room-by-room install plan
- Packing list keyed to floor plan
- Product data and care instructions
- Test and compliance certificates
- Snag list and sign-off sheet
- Spare parts and attic stock
- Warranty terms and contacts
- Photo record at dispatch and delivery
Pricing basis, agreed per project
- FOB
- We hand over at the port of origin; you control freight.
- CIF
- We arrange freight and insurance to your destination port.
- DDP
- Delivered, cleared and staged to site, with a single landed price.
All proposals are subject to contract.
Supply-chain compliance and ESG
Compliant by design, documented for every market.
We plan the paperwork at design stage, not at customs, so owners, lenders and operators can rely on it.
North America
Fire performance (CAL TB 117-2013; NFPA 701 for textiles; TB 133 where required), low-emission composite wood (TSCA Title VI / CARB Phase 2), timber declarations (Lacey Act), forced-labour traceability (UFLPA).
Europe and UK
CE / UKCA marking where applicable; EU General Product Safety Regulation; UK furniture fire-safety regulations and EN 1021 / BS 5852 ignition tests; REACH; timber due diligence (EUTR today, EUDR from 30 December 2026).
Spain and Latin America
Destination customs documents and certificates of origin, Spanish-language specifications and handover files. Spain follows the EU set above.
Standards are indicative and requirements vary by product, project and jurisdiction. We confirm scope against local advisers before specification is locked.
ESG built into the package
Responsible materials
Certified timber (FSC / PEFC) on request.
Factory standards
Social and safety audits (for example SMETA or BSCI) before award.
Traceability
Supplier and materials register for every package.
Lifecycle
Durable, repairable products and lower-waste packaging.
Material and supplier data can be packaged to feed GRESB, ESG and Scope 3 embodied-carbon reporting.